Houston Ship Channel Bridge

Houston, USA
Project
Construction of twin span cable stay bridge (main span 402m) with complex, double X shaped concrete pylons of height 151m.
Client
Ship Channel Constructors JV – Zachry Construction & Traylor Brothers
Scope
Design and supply of 2no. 500 tonne self climbing jump form systems for construction of the main pylons. The complex pylons required a revolutionary, proprietary new system, for which OM Engineering is currently in the process of acquiring a US patent.
Schedule
The OM System was installed in March 2023. As of November 2025 the system had completed 33 complex lifts and was 70m+ above the deck level.