OM Engineering

Projects

Completed

Pattullo Bridge Replacement

Vancouver, Canada
Project
Replacement of the obsolete Pattullo Bridge with a cable stay bridge (main span 332m). The single H shaped concrete pylon will have a height of 163m.
Client
Fraser Crossing Partners – Acciona Construccion, Aecon & Leonhardt, Andra und Partner
Scope
Design and supply of 2no. self climbing jump form systems for construction of the main pylon. The H frame pylons taper in both directions.
Schedule
The system began operations in May 2022 and topped out in May 2024.